Eco Communities 101-B: Quick and Dirty Start Up Planning


PLANETARY AWARENESS/ SUSTAINABILITY

Sustainability means "a continuing process of economic and social development… that meets the needs of the present without compromising the ability of future generations to meet their own needs." [Global Tomorrow Coalition]

Easy things to implement to create a better community from the outset are guidelines which include:

SUSTAINABLE ENERGY AND WATER
·         Passive solar design
·         Greenhouses
·         Solar hot-water systems
·         Sky-lights
·         Wall mirrors
·         Fresh air ventilation
·         Low energy-use appliances
·         Low-flush toilets, sinks, and shower heads
·         Grey water use
·         Rain collecting systems

SUSTAINABLE AGRICULTURE
·         Community agriculture
·         Minimal road structure
·         Berms and swales to collect and control the flow of rainwater
·         Edible landscaping over ego landscaping (landscaping not just because it is pretty)
·         Community Gardens minimize the negative impact on native vegetation and critters who like to enjoy it, as well as minimizes the infrastructure required to make the gardens grow.

RECYCLING & RESOURCE MANAGEMENT
·         Household materials
·         Water purification and recirculation
·         Composting

DESIGN
·         Clustered housing
·         Shared gardens
·         Multi-use community spaces
·         Community Offices and Workshops
·      Village Center / Town Square where outsiders can come visit, trade, learn, etc.

      
    
    LOCATION LOCATION LOCATION

The single most important factor of community building, and the one that most often gets overlooked, is LOCATION. Many people find land for cheap and they get all atwitter about buying it and turning it into something. The problem with this is: reality. Bad land is the LAST place you want to build a community if you are starting from scratch and want to be able to function off the grid. What you want to look for are the same things the people that settled the land 10,000 years ago looked for: 

·         flowing water
·         security
·         variety of vegetation
·         minimal environmental concerns (floods, massive snow, etc)
·         good access to sun (never ever build on the north side of a mountain in a place where it snows)
·         access to over 50 inches of rainfall (that hits the ground ) annually
·         intersection of two ecosystems
o   The VERY best combination:
+  riparian: (at least one stream and one river) for water & vegetation for herd animals
+  wooded: for trees for the buildings, for security, and for hunting and gathering

Eco Communities 101-A: Intro to Community Building and Setup


COMMUNITY, DEFINED

(From Wikipedia)

A group of interacting people, living in some proximity (i.e., in space, time, or relationship). Community usually refers to a social unit larger than a household that shares common values and has social cohesion.

In human communities, intent, belief, resources, preferences, needs, risks, and a number of other conditions may be present and common, affecting the identity of the participants and their degree of cohesiveness.

In our work experience helping develop eco-communities around the world, and studying the ones that haven’t made it - from the Utopian and other movements in history - we’ve discovered one criteria, above all others, must be present for the community to survive: 
a concept of living and allowing others to live, without reserve. 
What this means is… the freedom and equality of EVERY person must be valued above any thought that someone is “right”. Communities that dictate behavior (must be vegan, must be Christian, etc) fail, invariably, in the long run. The concept of free will is strong in every person, and only a community which works towards balance in viewpoints can survive. A person can’t be threatened with expulsion if they give in and eat a hamburger after 12 years of following the yegan rules… nor can they be told that they are to be subject to anyone else. Each member must ”buy into” the concept of the village – they WHY of the community – without reserve... and the reason they want to be there has to be a choice they continue to make as their sense of community is renewed in the way they spend their day.  

The most successful eco-communities on the planet – those that have stood the test of time– are the Jewish Kibbutz and similarly-style religious orders (nunneries and monasteries) both far removed in Europe and of non-Christian traditions in Asia.

Successful communities share some easily identifiable qualities:
  • Regular community meal, though they range between daily to only once per week
  • Emphasize equality such that women are not subject to men or vice versa
  • A day without work every week (sabbath)
  • Honor special moments in time (holidays) with community feasts , fasts, dances, pilgrimages, fire circles, tests of feat, etc.
  • Leaders elected to run day-to-day operations
  • Consensus voting on plan for operations
  • Express concerns about the community only on specified days
  • Preference for, if not commitment to, silence and/or listening “from the heart” (not to fix)
 The communities we are working with have found the most success when they:
  • Honor the individual as equal to the community (limiting required communal responsibilities)
  • Institute a community shared-learning program where individuals help the community to succeed by sharing their knowledge freely
  • Have an effective barter system. (i.e. Your community has a chainsaw, to which every person is assigned one day of use in the month. You aren’t going to use it, but your neighbor Bob wants to, he can barter you for a bag of beets or an hour of help in the greenhouse plot to use it.)
  • Have individual property (even if leased from the group) and ability to use it within defined limits (zoning type agreements, for instance using permaculture and native species, and no fences allowed)
  • Do not require community members to participate in aspects of the community they do not wish to. Their dana is just that: theirs. They may balance the books or wash dishes. The key is: they must participate, at an agreed level, usually 10-20 hours per week.
  • Internships allow people who cannot afford to otherwise join the community with the possibility of participating without cost, for services performed - often housekeeping, marketing, or management positions.

Building Committee Training

Introduction - The Architectural Process


This manual will help you to prepare for the process of designing and building your new facility.

1          Identify your Need(s)

Each building project requires a careful evaluation of what is needed. Once a project is 80 percent at capacity, it’s time to start thinking bigger. When that time comes, the next step is to

2          Implement a Planning / Building Committee

Planning and Building Committees are integral to the process of design. They represent your project both outward - representing the needs to the architect and builders, and inward – sharing design and budgeting to the administration and benefactors. The members of this committee, or these committees, are often very active in the organization, broad-minded, level headed clear thinkers. The perfect balance in these committees is found when there are both general thinkers – with a broad range of experience and exposure, and specialists - who can finesse aspects of the design so that the result is a finer representation of the need. It is vital that building and planning committees have at least one member, preferably their chairperson, with a strong business and accounting sensibility. There are going to be large cost considerations in any project and it is vital that someone understand and be able to explain how the funding is obtained and distributed.  A committee of 5-7 is ideal in size, for schedule coordination and cohesiveness. A secretary should document all decisions.

The planning committee should, before the process of design even begins, obtain:

  • A site survey that documents boundaries, topography, locations of trees over 6” in diameter, adjoining buildings, streets and curbs, building setbacks, easements, and the location of utilities.
  • Zoning restrictions for the site
  • Deed restrictions
  • Drawings of existing facilities, if applicable

Planning Committee Do’s and Don’ts

Do:
  • Express your concerns to the Architect
  • Ask questions of the Architect
  • Alert the Architect if something appears to be wrong
  • Expedite payments to Architect and Contractor

Don’t:
  • Give the Contractor instructions – Communicate via the Chairperson to your Architect who will them work with Contractor
  • Allow members of the organization to perform construction unless they competitively bid for the work. Consult with your Architect.
  • Make unnecessary changes.

Selecting an Architect

Selecting and Architect is one of the single most important, and difficult, aspects of Construction. There are lots of architects out there that are good at lots of different things. Some are generalists, and others specialize in certain aspects of design: like residential, commercial, or even more specifically - restaurants or religious design.

There are two main thought processes in architect selection. 

Performance-based selection is when an Architect is selected based on his or her background and work history. The committee reviews and selects the Architect based on prior experience and interview connection. 

Design-based selection is when an Architect is selected based on ideas they are asked to bring to the table before the project officially gets awarded. Oftentimes, several Architects will be invited to participate in preliminary visioning, or even given a program to work with, and will provide very preliminary sketch ideas based on these criteria. Some Architects will do this for free, others will not. But a small fee in exchange for knowing that your Architect truly understands your vision before you get into a multi-year working relationship with them is sometimes very comforting, making this an ideal form of preliminary interview.

An Architect Questionnaire is the first place to start in this process. This allows the committee to review side-by-side the qualifications of all the Architects without seeing the Architect’s portfolios, which can sometimes be so artfully created that the information you might be looking for may not be present. These documents describe the Architect’s education and firm experience, the team they propose for the project, list of related work, references, list of current workload, and a written commitment to attend all meetings.

Once the Architect Questionnaires are reviewed and culled, a smaller group of potential Architects may be asked to submit portfolio materials.

Once 2-3 preferred Architects are chosen, interview should take place, preferably on site, with entire Building and/or Planning Committee(s). You might make a list of potential questions for the Architect to answer, and send that ahead so they can thoughtfully prepare for the process. But in my experience, the best interviews are not held to a strict regimental standard but are easy, flow, and might even take off on several different tangents. A great Architect will see this, and flow you right back into your next question so that they may address your concerns.

Once you have selected a preferred Architect, your chairperson will begin the process of contracting with them for their services. It is highly recommended that you use the AIA Contracting forms, which protect the rights and responsibilities of both the Architect and the Owner to the greatest extent possible. Most Architects will charge between 8-12% of the estimated construction cost for their work. A famous Architect will often charge between 12 and 15%.


Course of Design


Schematic Design – Develop a Building Program and Masterplan


A Building Program establishes the sizes and uses of areas required to meet your needs. This document provides two major benefits – it gives the Architect a guideline to design by - so that the end result reflects the need, and it assists the organization itself in laying out and understanding it’s ideals. As the program is developed, the organization can check itself against its purpose, realign itself to that purpose if required, and evaluate its functionality.

The end result of programming should include:
  • Organization Mission Statement
  • List of Goals
  • List of Needs
  • Information about the property
  • Budget
  • Specific requirements of different program areas, i.e. education, accessibility, administration
Sometimes, when there are many buildings, or many phases required, a Masterplan is ideal. This document specifically addresses site and surrounding area, in a level of detail far beyond the scope of a Building Program. The exact size and shape of the building is not necessary at this time. A Masterplan allows the building and planning committees an opportunity to see the functional relationships between different aspects of a building, identify phasing requirements, as well as identify relationships between inside and outside space. The Masterplan is expected to be a “living” document, not set in stone, as the program develops or future needs are changed, the Masterplan is changed. It should give a fairly accurate snapshot of the design ideas as they are idealized today.

After these processes are completed, or alongside them, the Architect will prepare Schematic Design documents, which will include conceptual plans and elevations for the building and site, as well as a conceptual cost estimate for the work.

The cost for completing Schematic Design Documents is usually about 15% of the Architects’ total budget. (Masterplanning and Building Programming are separate services.)
The cost for completing Design Development Documents is usually about 15% of the Architects’ total budget.

Design Development – Finesse the Design

           
After the organization approves the Schematic Design Documents, the Architect will prepare more detailed documents allowing for inclusion of technical criteria like mechanical, electrical, plumbing, and green design considerations, as well as outline specifications. An updated and much more clearly defined construction estimate is prepared.

The cost for completing Design Development Documents is usually about 15% of the Architects’ total budget.

Construction Documents – Prepare Documents for Contractors

After the organization approves the Design Development Documents, the Architect will prepare working drawings, which will elaborate each dimension and detail for the Contractors to use for construction.

The cost for completing Construction Documents is usually about 40% of the Architects’ total budget.

Bidding and Negotiation – Choosing a Contractor

Your Architect will submit, on your behalf, the plans to the city or county building officials for permit review. Alongside the process, the projects will be announced to interested builders. This process can happen in many ways, and your Architect can assist you in determining which method is right for your organization. The result of this phase is a Contractual Agreement with your preferred Contractor. To be clear – you have a Contractual relationship with your Architect(s), and with your Contractor, separately. Your Architect and Contractor do not have ANY legal relationship other than a desire to get your project built to the design standard you select.

The cost for completing Bidding and Negotiation is usually about 10% of the Architects’ total budget.

Construction Administration – Watch the Building Grow from the Ground Up!


Construction Administration is the phase when the building goes from designs on paper to a tangible edifice rising above the land. The Architect and Contractor will work hard to ensure that the building result is an accurate refection of design intentions and program requirements. Your Architect will assist the Contractor with supplementary drawings, site visits to answer questions and document progress, review the Contractors pay Applications, prepare and authorize changes to the work (Change Orders), determine the date of substantial completion, prepare the final punchlist, and collect warranty data.

The cost for completing Construction Administration is usually about 20% of the Architects’ total budget.

Food for thought: Land Design and a common domain design critique

So many times, when people send me their community or domain design for review, they send something that looks like this little doodle:

and every time, I have to tell them that this design only works in these ways.
  1. It is organized.
  2. It is regular, and therefore fair to the people who might purchase a lot within it.
  3. It would work okay for recovering farmland for a kin domain or ecosettlement.
  4. It would work okay in a temperate zone, with little or no annual snow or ice.
Here's some thoughts about working with the land to make sure not only ours but the Earth mama's needs are met too. There are some subtle nuances that vernacular architects are trained to know about the location of buildings and the way the buildings work within the landscape that can really help you with design. Here are the ones that come to mind most immediately.

New Kins Domain!


I prepared the preliminary sketch for this Kin Domain for a friend of mine today. This is an example of how the thought process of designing a site works, before we get into the design of the structure itself. This site is just under an acre and a half in size and located in Taos, New Mexico, US. Note that in this plan, the berry hedges are kept inside the fenceline by 5'. Many people miss in the books that Anastasia told us to set the berry fence inside the actual line of the property so that natural circulation paths could be provided between domains. This also helps in harvesting both sides of the bushes (of course, the birds and critters won't mind either! *smile* Also, I left the southwest side of the property open as it bounds an existing acequia (diverted stream) and the vegetation provides a habitat for nesting and migratory birds.

The suggestions for the building materials echo those of the Southwest Architectural Vernacular as well and those for the Arid Climate Region. The suggested plantings respond to plants that grow well in USDA Climate Zone 5, and are proven in New Mexico's arid conditions.

I offer this as an example of what can be done for very little investment. The actual drawing is 11 inches by 11 inches (in honor of today's lucky date!) and can be blown up to 24x24 - large enough for use in actual site layout. This work would take approx. 2 days, preferably with a site visit, and would cost $500. I did this completely by hand, as a means of showing what can be done onsite. Preliminary drawings are fine when done like this. For a project to be installed by contractors (rather than oneself), or for more formal design documents, we'd put all the drawings in CAD, at an hourly rate of $50.

Southwest Vernacular Zone

The Southwest Vernacular Zone is composed of the southern Rockies, the Mohave and Sonoran deserts, and Southern California. The semi-arid to arid environment of the southwest makes for bitter cold winters and sweltering summers. The earth forms include plateaus, mountains, valleys, plains, and canyons.

Arid & Mediterranean Climatic Zone Design Specifics

Weather
Temperatures in these zones range from 10 degrees to 120 degrees F. Sunshine is predominant, with over 85% of available hours bathed in clear skies and sunlight. The highest wind velocities are most often in afternoons during spring and fall. Winds over 20mph may be dust-laden. Night winds are often cooler, coming down from the mountains as the cool air is heavier and prone to behaving like water, flowing downhill. This can be used to advantage for nighttime cooling of structures if the buildings are at the base of mountains or within valleys.  These areas are prone to afternoon precipitation in summer “monsoon” season of June through August, if at all. Average yearly rainfall is usually under 20 inches, except in mountains, where snow is likely in winter. Water conservation, greywater use, and rainwater collection are vital. Low humidity allows for unique solutions in evaporative cooling.

Choosing a building Site! Sneak Peak at one of the Chapters!!!

Oftentimes, the land is one of the least relevant features of a building. You get to choose between  property you have… or property you can afford. Sometimes though, that’s not enough. In those cases, the selection of the site can allow you to dream far bigger than you ever thought possible. Your real estate agent knows what generic home or land buyer X wants, and they know how to answer these questions:
Site Selection Conventional Criteria


Beauty
Views
Trees
Quality of Life
Neighbors
Proximity to Police, Fire, & Medicine
Schools
Shopping
Recreation
Investment
Property Values
Security
Taxes
Design
Codes and Covenants
Gas, Water, Sewer, Power
Roads & Transportation
Slope & drainage

These get to the meat of things. But what about the HEART of things? What’s missing? In Japan, every landscape is designed to play host to the god(s). There are mountains, valleys, waterfalls, streams, and abundant plants, especially flowering ones, which can delight the senses. There’s something to this practice, and when combined with an attention to ecology and relationship, they create a way of seeing the site of your new home in an entirely new way. 
How about adding these criteria to help you design the perfect space?
The New Paradigm
Energy Factors
Solar Exposure
Alternative Energy Sources
Greywater & Rainwater Harvesting
Location on Site (on-slope)
Natural Factors
Growing Season
Native Plants
Soil Conditions
Water Supply and Sourcing
Wildlife Habitat
Wind Exposure
Manmade Factors
Development Potential
Light Pollution
Sound Pollution
            Spiritual Factors
                        Community
Connection to heaven/earth
Connection to the Four Directions
Place for Spirit to Abide

Implementing a Planning / Building Committee for Public Architecture

Planning and Building Committees are integral to the process of design for public spaces. Public spaces include an occupancy where there is a tendency for many people go gather for various reasons. This process is not necessary for residential construction.

A building or planning committee represents your project both outward - representing your group's needs to the architect and builders, and inward – sharing design and budgeting to the administration and benefactors. The members of this committee, or these committees, are often very active in the organization, broad-minded, level headed clear thinkers. The perfect balance in these committees is found when there are both general thinkers – with a broad range of experience and exposure, and specialists - who can finesse aspects of the design so that the result is a finer representation of the need. It is vital that building and planning committees have at least one member, preferably their chairperson, with a strong business and accounting sensibility. There are going to be large cost considerations in any project and it is vital that someone understand and be able to explain how the funding is obtained and distributed. A committee of 5-7 is ideal in size, for schedule coordination and cohesiveness. A secretary should document all decisions.

The planning committee should, before the process of design even begins, obtain:
-A site survey that documents boundaries, topography, locations of trees over 6” in diameter, adjoining buildings, streets and curbs, building setbacks, easements, and the location of utilities.
-Zoning restrictions for the site
-Deed restrictions
-Drawings of existing facilities, if applicable

Planning Committee Do’s and Don’ts

Do-Express your concerns to the Architect
-Ask questions of the Architect
-Alert the Architect if something appears to be wrong
-Expedite payments to Architect and Contractor

Don’t
-Give the Contractor instructions – Communicate via the Chairperson to your Architect who will them work with Contractor
-Allow members of the organization to perform construction unless they competitively bid for the work. Consult with your Architect.
-Make unnecessary changes.

Selecting an Architect

Selecting and Architect is one of the single most important, and difficult, aspects of construction. There are lots of architects out there that are good at lots of different things. Some are generalists, and others specialize in certain aspects of design: like residential, commercial, or even more specifically - restaurants or religious design.

There are two main thought processes in architect selection.

Performance-based selection is when an Architect is selected based on his or her background and work history. The committee reviews and selects the Architect based on prior experience and interview connection. In residential design, it is often this connection - a natural ability to relate to one another - between the architect and the family that determines who gets selected.

Design-based selection is when an Architect is selected based on ideas they are asked to bring to the table before the project officially gets awarded. This concept is almost never used in residential design as most residential designers are not interested in "competing" for work. Sometimes in a large scale project (over $2million in construction costs), several Architects will be invited to participate in preliminary visioning, or even given a program to work with, and will provide very preliminary sketch ideas based on these criteria. Some Architects will do this for free, others will not. But a small fee in exchange for knowing that your Architect truly understands your vision before you get into a multi-year working relationship with them is sometimes very comforting, making this an ideal form of preliminary interview. An Architect Questionnaire is the first place to start in this process. This allows the committee to review side-by-side the qualifications of all the Architects without seeing the Architect’s portfolios, which can sometimes be so artfully created that the information you might be looking for may not be present. These documents describe the Architect’s education and firm experience, the team they propose for the project, list of related work, references, list of current workload, and a written commitment to attend all meetings. Once the Architect Questionnaires are reviewed and culled, a smaller group of potential Architects may be asked to submit portfolio materials.

Once 2-3 potential Architects are chosen, interview should take place, preferably on site, with entire Building and/or Planning Committee(s). You might make a list of potential questions for the Architect to answer, and send that ahead so they can thoughtfully prepare for the process. In my experience, the best interviews are not held to a strict regimental standard but are easy, flow, and might even take off on several different tangents. A great Architect will see this, and flow you right back into your next question so that they may address your concerns.

Once you have selected a preferred Architect, your chairperson will begin the process of contracting with them for their services. It is highly recommended that you use the AIA Contracting forms, which protect the rights and responsibilities of both the Architect and the Owner to the greatest extent possible. Most Architects will charge between 8-12% of the estimated construction cost for their work. A famous Architect will often charge between 12 and 15%.

Working with with an Architect - The Course of Design

Schematic Design – Develop a Building Program and Masterplan

A Building Program establishes the sizes and uses of areas required to meet your needs. This document provides two major benefits – it gives the Architect a guideline to design by - so that the end result reflects the need, and it assists the organization itself in laying out and understanding it’s ideals. As the program is developed, the organization can check itself against its purpose, realign itself to that purpose if required, and evaluate its functionality.

The end result of programming should include:

- Organization Mission Statement
- List of Goals
- List of Needs
- Information about the property
- Budget
- Specific requirements of different program areas, i.e. education, accessibility, administration

Sometimes, when there are many buildings, or many phases required, a Masterplan is ideal. This document specifically addresses site and surrounding area, in a level of detail far beyond the scope of a Building Program. The exact size and shape of the building is not necessary at this time. A Masterplan allows the building and planning committees an opportunity to see the functional relationships between different aspects of a building, identify phasing requirements, as well as identify relationships between inside and outside space. The Masterplan is expected to be a “living” document, not set in stone, as the program develops or future needs are changed, the Masterplan is changed. It should give a fairly accurate snapshot of the design ideas as they are idealized today.

After these processes are completed, or alongside them, the Architect will prepare Schematic Design documents, which will include conceptual plans and elevations for the building and site, as well as a conceptual cost estimate for the work.

The cost for completing Schematic Design Documents is usually about 15% of the Architects’ total budget. (Masterplanning and Building Programming are separate services.)


Design Development - Finesse the Design

After the organization approves the Schematic Design Documents, the Architect will prepare more detailed documents allowing for inclusion of technical criteria like mechanical, electrical, plumbing, and green design considerations, as well as outline specifications. An updated and much more clearly defined construction estimate is prepared.

The cost for completing Design Development Documents is usually about 15% of the Architects’ total budget.


Construction Documents – Prepare Documents for Contractors


After the organization approves the Design Development Documents, the Architect will prepare working drawings, which will elaborate each dimension and detail for the Contractors to use for construction.

The cost for completing Construction Documents is usually about 40% of the Architects’ total budget.


Bidding and Negotiation – Choosing a Contractor


Your Architect will submit, on your behalf, the plans to the city or county building officials for permit review. Alongside the process, the projects will be announced to interested builders. This process can happen in many ways, and your Architect can assist you in determining which method is right for your organization. The result of this phase is a Contractual Agreement with your preferred Contractor. To be clear – you have a Contractual relationship with your Architect(s), and with your Contractor, separately. Your Architect and Contractor do not have ANY legal relationship other than a desire to get your project built to the design standard you select.

The cost for completing Bidding and Negotiation is usually about 10% of the Architects’ total budget.


Construction Administration – Watch the Building Grow from the Ground Up!


Construction Administration is the phase when the building goes from designs on paper to a tangible edifice rising above the land. The Architect and Contractor will work hard to ensure that the building result is an accurate refection of design intentions and program requirements. Your Architect will assist the Contractor with supplementary drawings, site visits to answer questions and document progress, review the Contractors pay Applications, prepare and authorize changes to the work (Change Orders), determine the date of substantial completion, prepare the final punchlist, and collect warranty data.

The cost for completing Construction Administration is usually about 20% of the Architects’ total budget.